WE PROVIDE THE FOLLOWING SERVICES: 

• Fabrication of structural steelwork 
• Fabrication of plate work 
• Erection of steel structures 
• Fabrication of pipe fittings 
• Installation of pipe lines 
• Rigging Service 

WE ARE PROUD TO BE OF SERVICE TO THE FOLLOWING COMPANIES:

• Richards Bay Minerals -  since 1989 
• Rodcol  
• Tronox 
• NRB Piping  
• Easy coat 
• Bay Fiber 
• C.T.C 
• Ndwanye Network 


PROJECTS COMPLETED

2002 Richards Bay MineralsR 2 700 000.00 Dewatering and feed pipes for Secondary Dredge
2002 Richards Bay Minerals R 600 000.00 68 Buoyancy Pontoons
2003 Richards Bay Minerals R 2 200 000.00Booster pump station structure and pipes for Return  
Water pipe line 
2004 Richards Bay Minerals R 1 520 000.00 Installation of GRP pipe line at Richards Bay Minerals 
2007 C.T.C R 500 000.00 Local service pit   
2012 Richards Bay MineralsR 3 800 000.00Pond D shut  
2011 Richards Bay MineralsR2 700 000.00Pond C Overflow Launders
2010 Richards Bay MineralsR 1 600 000.00 Cooling towers refurbishment at Richards Bay Minerals
2015 Richards Bay Minerals R 21 000 000.00Pipe contract for 20 months to fabricate, rubber line and install pipes at Richards Bay Minerals
2016 Richards Bay MineralsR 4 700 000.00Ducting for Iron injection bag house  
2016 Richards Bay MineralsR 2 100 000.00Bunker roof structure
2017 Richards Bay MineralsR 4 300 000.00Bag house ducting replacement 
2017 Richards Bay MineralsR 2 600 000.00Refurbish and replace MSP F&H Structure
2017  Richards Bay Minerals R 1 200 000.00New Roaster Conveyor load hopper 
2017 RodcolR 2 200 000.00Tronox HMC bins replacement 
2018 Richards Bay MineralsR 2 000 000.00 MPC intermediate walkway replacement 
2018 Multo tecR 700 000.00Pond D pipe launders replacement 
2018 Richards Bay MineralsR 3 000 000.00 MPD booster station Refurbishment 
2018 Richards Bay MineralsR 23 000 000.00 15 Km new Haul road pipeline
2019 Richards Bay MineralsR 2 200 000.00 PCM 2 Roof replacement 
2020 Richards Bay MineralsR 495 000.00 MPC Vibrating screen chute replacment
2020 Richards Bay Minerals R 1 250 000.00Roaster feed hopper replacement 
2021 Richards Bay Minerals R 520 000.00Damen dredge installation
2021 Richards Bay MineralsR 950 000.00Booster T14 Refurbisment
2021 Richards Bay MineralsR 670 000.00Flare stack tip replacment